Platform Lift Preparations

Concrete

Dave Larimore supervises Elizabeth Collins as she trowels the concrete slab for the new platform lift.

Work on the platform lift from the main lobby on the ground floor to the narthex (the lobby at the back of the sanctuary) is progressing. Dave Larimore poured the concrete slab to support the lift this morning. The next step will be to frame in the passageway and shaft. After the platform lift is installed, doors will be placed in both the main lobby and the narthex. When the project is complete the only difference visible in the main lobby will be the door in the east wall leading to the lift.